2023
Battery Energy Storage System Study - 2023-09-29
Combustion Turbine Feasibility Study - Overview - 2023-10-04
Combustion Turbine Feasibility Study - Enclosing Hatch Concept Design Report dated September 28, 2023 - REDACTED - 2023-10-13
Avalon Supply (Transmission) Study - REDACTED - 2023-10-31
2024
2023 Long-Term Load Forecast Report - 2024-03-28
Bates White Consulting - Load Forecast Review Report - 2024-07-25
2024 Resource Adequacy Plan - REDACTED - REVISION 2 - 2024-08-26
Bates White Consulting - Assessment of NLHs - 2024 Resource Adequacy Plan - 2024-08-30
Load Forecast - Reliability Planning Criteria - Presentation - Technical Conference 1 - 2024-09-17
Issue 3 - Existing Generation and Transmission - Presentation - Technical Conference 2 - 2024-10-01
Issue 4 - Resource Supply Options - Presentation - Technical Conference 2 - 2024-10-02
Scenarios and Sensitivities - Modelling Approach and Considerations - Presentation - Technical Conference 3 - 2024-10-16
Expansion Plan, Insights and Next Steps - Presentation - Technical Conference 4 - 2024-10-29
2025
150 MW Combustion Turbine Plant FEED Study - Redacted - 2025-06-13
Capital Cost Estimate - Redacted - 2025-06-13
Avalon Combustion Turbine – Basis of Design - Redacted - 2025-06-13
Fuel Unloading Options Memo - Redacted - 2025-06-13
Capex Estimate for Incremental 50 MW Size Increase, Class 5 - Redacted - 2025-06-13
O and M and Lifecycle Cost Estimate - Redacted - 2025-06-13
Community Noise Impact Assessment - Redacted - 2025-06-13
Best Available Control Technology Documents - Redacted - 2025-06-13
Water Supply Analysis and Environmental Review Report - Redacted - 2025-06-13
Avalon CT Comprehensive Risk Register - 2025-06-13
Bay d’Espoir Unit 8 FEED Report Introduction - Redacted - 2025-06-13
Bay d’Espoir Unit 8 – Basis of Design - 2025-06-13
Bay d’Espoir Unit 8 FEED – Scope of Work - Redacted - 2025-06-13
Options Analysis Report - Redacted - 2025-06-13
Bay d’Espoir Unit 8 FEED - Concept Design Update Report - Redacted - 2025-06-13
Monte Carlo Simulation Strategic and Tactical Risk Documents - Redacted - 2025-06-13
Bay d’Espoir Unit 8 FEED Risk and Assumption Register - 2025-06-13
Proposed Bay d’Espoir Hydro Generating Unit 8 – Hydraulic Analysis of the Conveyance - Redacted - 2025-06-13
Proposed Bay d’Espoir Hydro Generating Unit 8 – Class 3 Cost Estimate and Project Execution Schedule - Redacted - 2025-06-13
Bay d’Espoir Hydro Generating Unit 8 Summary Report - November 2018 - 2025-06-13
Bay d’Espoir Hydro Generating Unit 8 Summary Report - November 2022 - 2025-06-13
Bates White Consulting - Purchase and Installation of Bay d'Espior Unit 8 and Avalon Combustion Turbine - REDACTED - 2025-06-24
Application for Capital Expenditures for the Purchase and Installation of Bay d’Espoir Unit 8 and Avalon Combustion Turbine