Newfoundland and Labrador Hydro filed a Reliability and Resource Adequacy Study with the Board addressing both near-term and long-term reliability and supply adequacy for the province’s electrical system before and after the integration of the Muskrat Falls Project. The Study sets out Hydro’s view of near-term resource adequacy, long-term resource planning considerations and the resource options available to meet its proposed planning criteria.

 


Study
From NLH - Reliability and Resource Adequacy Study - November 2019 Update - 2019-11-15
From NLH - Reliability and Resource Adequacy Study - November 2018 - 2018-11-16
 
 
Notice
Newfoundland and Labrador Hydro Reliability and Resource Adequacy Study Review Invitation to Participate
  • Intervenor Submission Form
  •  
     
    Liberty Consulting Group Report
    The Liberty Consulting Group Reliability and Resource Adequacy Study Report - 2019-08-19
     
     
    Process
    To Parties - Phase Two Conclusion and Review of the Reliability and Resource Adequacy Study - Record and Proceeding - 2019-12-04
     
     
    Related Documentation
    Investigation and Hearing into Supply Issues and Power on the Island Interconnected System - Phase Two